Branch Indicator

  • You are here: S&P Denmark

Languages

Main Navigation en-NORDIC

Projects

Complete renewal - Bahnhofstreet - Schwyz, Switzerland

Crack Prevention

Complete renewal - Bahnhofstreet - Schwyz, Switzerland

Topic 
Complete renewal
Object 
Bahnhofstreet
City 
Schwyz
State 
Schwyz
Country 
Switzerland
Date 
2014

Solution

In order to permanently guarantee the flow of traffic and the accessibility of the properties, work was carried out in several longitudinal stages in each direction of travel. This stage affects the homogeneity of the road structure. On the one hand due to different weather conditions such as summer/winter and on the other hand due to the arrangement of the plant pipelines on one half of the road with corresponding crossings. S&P Carbophalt® G is used to locally reinforce the pavement joints of the base and the binder course. The asphalt reinforcement reduces the stresses in the pavement and thus increases its durability. Any cracks that may occur in the lower covering layers are stopped by carbon taping. The 4 cm thick surface covering (approx. 400 t) was installed without joints in one stage.

 

Material

1‘230 m2 S&P Carbophalt® G, widht of roll 1.50 m

Image Gallery

  • Applikation Asphaltbewehrung S&P Carbophalt G mit Abrollbock entlang Längsnaht

  • fertige Applikation über Längs- und Quernähte

  • Ausschneiden der Bewehrung im Bereich von Schächten

  • lokales Abstreuen der Bewehrung mit Mischgut (4 mm Korn)

Service

Contact person

You are here

    Contact

    S&P

    SIMPSON Strong-Tie

    Navigation