Torsion reinforcement - A4 road connection, Mosi south - Brunnen, Switzerland

Shear

Torsion reinforcement - A4 road connection, Mosi south - Brunnen, Switzerland

Topic 
Torsion reinforcement
Object 
A4 road connection, Mosi south
City 
Brunnen
State 
Schwyz
Country 
Switzerland
Date 
2013
Duration 
1 week

Situation

By utilizing staged construction, the Federal Road Office (ASTRA) is improving, in stages, the road safety for the Mositunnel and reconditions the road connection Brunnen south. The static verification showed that the access bridge from Brunnen to Sisikon must be strengthened to support torsion loading.

Solution

In regular intervals of 10.80 meters, massive steel crosses are set in the box girders. To accommodate the hoop tension, the box girder is wrapped with six layers of S&P C-Sheet 240 400 g/m2 (Modulus of elasticity 240 kN/mm2). The carbon sheets are engineered to provide a design tension capacity corresponding to a 0.6% elongation.

Material

Approximately 220 m2 S&P C-Sheet 240 400 g/m2

Image Gallery

  • Application of S&P C-Sheet 240

    Application of the S&P C-Sheets 240 300 mm wide at breakthrough

  • Finished reinforcement with UV-protection