Renovation of bridge columns - Schneggenbrücke - Glattfelden, Switzerland

Static retrofitting (wet-spray method) for structural enhancement

Renovation of bridge columns - Schneggenbrücke - Glattfelden, Switzerland

Topic 
Renovation of bridge columns
Object 
Schneggenbrücke
City 
Glattfelden
State 
Zürich
Country 
Switzerland
Date 
2011

Situation

The Building Department of Zürich is renovating the column of the Schneggen bridge, located under the central reservation of the motorway, because of concrete damages as well as insufficient concrete cover of the steel reinforcement.

Solution

Some of the concrete surface was grinded off and the edges were rounded off. Damaged concrete parts were rounded off. After wetting the concrete to capillary saturation, the first layer of S&P ARMO-crete w RQ was applied. The ARMO-mesh L200 (carbon fibres in the horizontal direction) was then pressed into the freshly applied mortar. Next, the second layer of ARMO-crete w RQ was applied using the wet-in-wet method, troweled off, and ground to the desired smoothness. A protective coat was applied, thus completing the reinforcement.

Material

approx. 4 tons of S&P ARMO-crete w RQ and 100 m2 ARMO-mesh L200

Image Gallery

  • The substrate after preparation for first mortar coat

  • Incorporation of the S&P ARMO-mesh L200 horizontally into the still fresh mortar (in strips)

  • After the application of the second layer of S&P ARMO-crete w RQ

Service

Contact person

Case Study

Related Products

S&P ARMO-System

Sprayable reinforcement mortars incorporating carbon and glass fibre meshes

You are here

    Contact

    S&P

    SIMPSON Strong-Tie

    Navigation